Pipe Layer
Sewell Construction and Demolition
Augusta Ga
10.2025 - 2026
- Installed and connected underground piping systems according to specifications.
- Operated heavy machinery, ensuring adherence to safety protocols and operational standards.
- Assisted in excavation and grading for pipe installation projects.
- Collaborated with team members to maintain project timelines and quality standards.
- Conducted routine inspections of installed pipes for structural integrity and functionality.
- Trained junior staff on safe operating procedures and proper installation techniques.
- Coordinated with contractors and utility companies to ensure compliance with regulations and permits.
- Assembled and installed underground pipe, fittings, and valves of various sizes.
- Used hand signals to direct equipment operators and alert to hazards.
- Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
- Handled all repairs for sanitary and storm water sewer structures and pipe systems.
- Expedited project timelines by quickly adapting to changing job requirements and adjusting workflows accordingly.