Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Heriberto Mora

Anderson

Summary

Seasoned Ironworker and Rigger with a proven track record at Performance Contractors Inc., adept in NCCER Ironworker practices and OSHA regulations. Excelled in enhancing safety and efficiency on job sites through rigorous rigging planning and strong teamwork. Demonstrated leadership by supervising teams and delivering projects within budget, showcasing exceptional rigging preparation and collaboration skills.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Rigger

TEiC
08.2024 - 11.2024
  • Rigged for heavy lifts according to blueprint requirements.
  • Improved lifting efficiency with proper selection of rigging equipment for specific tasks.
  • Increased workplace safety by conducting regular rigging inspections and equipment maintenance.
  • Worked at heights and in confined spaces without difficulty.

Crane Rigger

Integrity Pipeline Services
01.2024 - 05.2024
  • Ensured precise load placement by accurately calculating load weights and determining proper rigging configurations.
  • Performed pre-lift meetings with all involved parties to promote clear communication and understanding of roles and responsibilities throughout the lift process.
  • Mastered various knots and hitches when securing loads for transport or aerial delivery, optimizing stability and safety of the items being moved.
  • Assisted crane operators with detailed load charts and calculations in order to guarantee safe weight distribution during the lift process.
  • Minimized project delays by promptly identifying and addressing any rigging issues or malfunctions.
  • Maintained a clean work area, contributing to both safety standards and overall professionalism of the job site.
  • Increased efficiency in crane operations by effectively communicating with crane operators and ground personnel.

Crane Rigger

Thompson Construction Group Inc.
05.2023 - 10.2023
  • Ensured precise load placement by accurately calculating load weights and determining proper rigging configurations.
  • Performed pre-lift meetings with all involved parties to promote clear communication and understanding of roles and responsibilities throughout the lift process.
  • Mastered various knots and hitches when securing loads for transport or aerial delivery, optimizing stability and safety of the items being moved.
  • Assisted crane operators with detailed load charts and calculations in order to guarantee safe weight distribution during the lift process.
  • Minimized project delays by promptly identifying and addressing any rigging issues or malfunctions.

Ironworker Foreman

Spirit Construction
02.2022 - 03.2023
  • I was forman in First Quality
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • I was responsible for Erecting Half of the Building That cover the paper machine
  • Than i was the rigging forman for the project
  • i was over 5 rigger and 3 cranes


Journeyman Ironworker

Thompson Construction Group Inc.
09.2021 - 02.2022
  • I came in as Connector
  • than move up to rigger

Journeyman Ironworker

LPR
09.2020 - 08.2021
  • Building a Battery plant
  • I came as a connector and them move up to leadman possition
  • I was responsible for steel erection

Ironworker Foreman

Hawk Installation
01.2020 - 08.2020


  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Responsible of modifying old building and some steel erection

Journeyman Ironworker

S&B
06.2019 - 11.2019
  • work on phillips 76 refinery
  • was the connector for 5 mounths

Ironworker Foreman

Hawk Installation
01.2019 - 06.2019
  • working in houston port was building a conveyors
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • i was erecting steel with 5 men crew and installing conveyors in place
  • finish job on time

Ironworker Foreman

Performance Contractors Inc.
01.2018 - 12.2018
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.
  • Prioritized safety across job site with specific attention to load suspension, erecting steel
  • I was responsible fora 5 men crew hanging iron

Journeyman Ironworker

CB&I
12.2017 - 01.2018
  • Connector
  • Rigger

Ironworker Foreman

Performance Contractors Inc.
08.2017 - 12.2017
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Change a Cooling tower
  • replace the old one for the new one

Journeyman Ironworker

Performance Contractors Inc.
01.2016 - 06.2017
  • I came in as Leadman got promoted to Raising Gang forman
  • Supervised 4 employees in erecting steel in Dow Chemicals

I was over a crane and 2 riggers

  • Demonstrated commitment to excellence by adhering to industry standards while erecting steel frameworks for various structures.
  • Improved workplace organization by maintaining a clean job site, reducing hazards and increasing efficiency.
  • Took forman classes though them.
  • Great when it comes to work in team and great leader

Journeyman Ironworker

Performance Contractors Inc.
09.2014 - 12.2015

Work on CF Industries

  • I got there as a leadman for raising gang forman
  • we build a pipe rack and flare tower
  • Supervised 4 employees in erecting steel
  • When finish erecting steel we got move to bullrigge pipe in to place and pipe rack
  • great team work

Journeyman Ironworker

Performance Contractors Inc.
04.2013 - 05.2014
  • Demonstrated commitment to excellence by adhering to industry standards while erecting steel frameworks for various structures.
  • Maintained high-quality workmanship through precise cutting, fitting, and aligning of steel components.
  • I came in as a connector eventually finish the project as a lead men for the raising gang forman.
  • I did rigging when i was the lead men.


Education

High School Diploma -

Reading Senior High School
Reading, PA
06-2009

Skills

  • NCCER Ironworker
  • Rigger
  • Rigging preparation
  • OSHA regulations
  • Materials movement
  • Equipment moving
  • Load movement control
  • Rigging planning
  • Climbing skills
  • Teamwork
  • Teamwork and collaboration

Certification

Nccer Ironworker

Nccer Riger

Stracture Welding

Languages

English
Full Professional
Spanish
Full Professional

Timeline

Rigger

TEiC
08.2024 - 11.2024

Crane Rigger

Integrity Pipeline Services
01.2024 - 05.2024

Crane Rigger

Thompson Construction Group Inc.
05.2023 - 10.2023

Ironworker Foreman

Spirit Construction
02.2022 - 03.2023

Journeyman Ironworker

Thompson Construction Group Inc.
09.2021 - 02.2022

Journeyman Ironworker

LPR
09.2020 - 08.2021

Ironworker Foreman

Hawk Installation
01.2020 - 08.2020

Journeyman Ironworker

S&B
06.2019 - 11.2019

Ironworker Foreman

Hawk Installation
01.2019 - 06.2019

Ironworker Foreman

Performance Contractors Inc.
01.2018 - 12.2018

Journeyman Ironworker

CB&I
12.2017 - 01.2018

Ironworker Foreman

Performance Contractors Inc.
08.2017 - 12.2017

Journeyman Ironworker

Performance Contractors Inc.
01.2016 - 06.2017

Journeyman Ironworker

Performance Contractors Inc.
09.2014 - 12.2015

Journeyman Ironworker

Performance Contractors Inc.
04.2013 - 05.2014

Nccer Ironworker

Nccer Riger

Stracture Welding

High School Diploma -

Reading Senior High School
Heriberto Mora