Results-driven quality assurance professional with extensive experience at PPG, excelling in visual inspection and defect identification. Demonstrated expertise in calibration techniques and performance testing, ensuring compliance with safety standards. Adept at problem-solving and fostering teamwork, consistently enhancing production efficiency and product quality. Skilled inspector with solid experience in quality control, safety procedures, and compliance protocols. Strong understanding of inspection tools and techniques, adept at identifying inconsistencies and implementing corrective actions. Noteworthy ability to drive continuous process improvements while ensuring adherence to industry regulations. Consistently contributed to achieving high-quality standards in previous roles.
• Inspection of Production – Level I: I conducted a visual inspection of boxes and parts on the ecoat shelf, identifying missing parts and applying light touch-ups with Scotch-Brite. I executed the calibration of the DFT meter, recording both the calibration and the corresponding readings. I identified and pointed out common defects using a China marker and yellow foam, and I removed masking when necessary.
• Production Inspection – Level II: I acted as the final inspector, performing performance tests such as wet adhesion, solvent testing, and rub testing. I identified rare defects in the ecoat process and specific defects according to client standards. I reviewed MITS and B10 labels, inspected packaging quality, and identified discrepancies. I applied touch-ups with fine sandpaper and identified defects in the Hemseal system.
• Production Inspection – Level III: I performed final verification duties on the shipping dock, ensuring compliance with all steps of the above process. I detected nonconformities in incoming raw materials and made minor adjustments using a DA sander. I also performed disassembly validations for internal shipments.
* Operated the hemseal line according to work instructions, ensuring the proper application of the coating on production parts.
* Diagnosed and resolved issues within the hemseal system, including pump replacement and maintenance.
* Trained to fully start up and shut down the hemseal line, ensuring safe and efficient operations.
* Performed inspections and preventive maintenance on racks, contributing to the organization and safety of the work area.
* Copper Star Award – PPG: Recognition for consistently improving performance in the quality control area during my time as Associate Production Inspector at levels I, II, and III. Surpassed set objectives, demonstrating a strong commitment to excellence in production processes.